BTS Installation & Commissioning


  BTS INDOOR INSTALLATION
​          -        Un-packaging and Goods Verification and Shifting
          -        ​Battery Bank Installation
          -        ​SMPS Installation
          -        ​Surge Arrester Installation
          -        ​Installation of BTS Rack
          -        ​​Power Cable and Grounding Cable routing and Termination on MCB / IGB
          -        ​E1 Cable Routing and Punching On DDF
          -        ​Lightning Protection Box, IGB, MCB, DDF Installation
          -        ​Alarm Cable Routing and Environment Detection Sensor Fixing
          -        ​RF Jumper Cable Connector Making
          -        ​Installation for Cable Tray as per requirement
          -        ​Labeling for all Cable and Sector
          -        ​Prepare Hardware Installation Report

  BTS OUTDOOR INSTALLATION
          -        ​​GPS Antenna Mounting and cable routing
          -        3-Sectors Site Outdoor Antenna Mounting
          -        Feeder cable Installation and routing
          -        ​Earthing of Feeder cable
          -        ​Connection of  Jumper cable to Feeder on GSM antenna end
          -        ​Connection of  Jumper cable to Feeder on BTS end
​          -        Surge Arrestor Installation and Grounding to OGB
          -        ​OGB & Feeder Cable Windows Installation
          -        ​Installation of Outdoor Cable Tray
          -        ​Labeling For all Cable and Sector

  BTS COMMISSIONING
​          -        BTS Power on and Card Check
          -        ​Transmission Connectivity Integration
          -        ​Integrate BTS with BSC
          -        ​Call Testing and Recording Results
          -        ​Integration of External Alarms and Alarm Testing
          -        ​Labeling For all Cable and Sector

  INSTALLATION & COMMISSIONING OF MICROWAVE EQUIPMENT
          -        ​Hoisting of MW Antennas and ODU
          -        ​Hoisting of IF cables
          -        ​Installation of IDU
          -        ​Earthing
          -        ​Connectorization
          -        ​Integration of MW IDU with BTS
          -        ​Antenna Alignment and power testing

  ​ACCEPTANCE TESTING
          -        ​Getting Hardware Installation Acceptance Certification
          -        ​Preparing ATP Document for Testing
          -        ​Arranging Testing Record
          -        Organizing ATP testing
          -        ​​Signing-off of ATP Certificate
          -        ​Preparing and Submiting Site Folder